Library Boiler & Controls Replacement Project

The work is generally described as replacement of the existing boiler system and upgrade of the existing building controls system. The engineer’s estimate is $190,000 and the job duration is 120 calendar days.

A prebid conference will be held at 10:00 AM on September 10, 2018 at the Public Library. Attendance at the prebid conference is mandatory for all prime contractors submitting a bid. For those who have attended the prebid conference, additional site visits can be scheduled if the City is notified 24 hours in advance.

Bids Due:

September 20, 2018, at 2:00 PM
130 Avram Avenue, Rohnert Park, CA 94928

Bid Documents

Project Contact:

Terrie Zwillinger
Project Manager
Department of Public Works
Direct (707) 588-3331
Main (707) 588-3300
Fax (707) 588-3333
Email: TZwillinger@rpcity.org