Sunrise Park Path and Landscaping Improvements, Project No. 2017-25

The work is described generally as demolition of old asphalt pathways and installation of new concrete pathways, replacement of existing drinking fountains, asphalt repairs and seal coast to existing parking, installation of sodded turf, adjustments to irrigation system and perimeter fencing (alternate).

The Contractor must have a valid California contractor's license, a Class A or C12 license. The Engineer’s estimate for this project is $813,100.

A copy of the drawings, specifications, and bid packet may be obtained from Draftech Blueprinting, 1544 Terrace Way, Santa Rosa, CA 95404, telephone: (707) 578-9442, upon payment of a nonrefundable fee as specified by Draftech.


Bids Due:
Tuesday, August 13, 2019, at 2:00 PM
130 Avram Avenue, Rohnert Park, CA 94928



Bid Documents

Bid Results

Project Contact:

Deborah DiGiovanni
CIP Manager
Development Services
Direct Line: (707) 588-2212
Main Phone: (707) 588-2232
Fax: (707) 794-9242
Email: DDiGiovanni@rpcity.org

Social Media